EmbLogic's Blog

Category Archives: Uncategorized

multipal data compression status

sir,   I completed my data compression and decompression project for the case 4.    

Posted in Uncategorized | Leave a comment

3d array

sir, the ans. to your question of 3d array is *(*(*(P+6)+5)+3)

Posted in Uncategorized | 3 Comments

Multiple data compression status:

sir, i have complete multiple data compression and decompression using case 4 .

Posted in Uncategorized | Leave a comment

Status of Serial Port

sir.. I have transmitted 1 byte using NULL modem between 2 DTE successfully.. i want to transmit complete file using serial driver so what should i do ? pls give me the hint…

Posted in Uncategorized | Leave a comment

debugging tools

sir, today i use gdb tools with our programs,,,,really it is very helpful to find out the error with in our programs.

Posted in Uncategorized | Leave a comment

MULTIPLE DATA COMPRESSION UPDATE

multiple data compression and decompression for byte size 4 is completed…..

Posted in Uncategorized | Leave a comment

Compression and decompression

The compression and decompression of a file with byte size 4 bit has done… .

Posted in Uncategorized | Leave a comment

Serial Port and MDC

sir.. i have completed the serial port using loopback method and also completed multiple data compression case 4 sucessfully

Posted in Uncategorized | Leave a comment

linux installation

installed linux on windows 7 computer after restarting automatically GRUB opened How can i boot my windows and linux now…???

Posted in Uncategorized | Leave a comment

Makefile

When you give make command then the makefile creates its files according to the functionality of makefile in current directory but if you want to make the resultant executable in your defined path then you have to define ‘install: ‘ … Continue reading →

Posted in Uncategorized | Leave a comment

UPDATE 26-12-2011 to Pravjot sir

sir I have completed assignment regarding RCS with regards Dharmendra Nath Shandilya

Posted in Uncategorized | Leave a comment

UPDATE 24-12-2011 to Pravjot sir

Sir ,assignment regarding  make utility has been completed

Posted in Uncategorized | Leave a comment

STATUS: Development_Tools

I have successfully completed all three assignments associated with development tools.

Posted in Uncategorized | Leave a comment

PROJECT MANAGEMENT TOOL

i done all my todays assignment….

Posted in Uncategorized | Leave a comment

update: Termios

I have successfully completed all the assignments associated with General Terminal Interface

Posted in Uncategorized | Leave a comment